UK trade guideBoiler Spares 5 min readUpdated 11 July 2026

How to Replace the Siphon Trap on a Main Eco Compact 25 (UK)

Step-by-step UK guide to replacing the condensate siphon on a Main Eco Compact 25. Part numbers, torques, commissioning.

Main

The part

Replace the condensate siphon on Main Eco Compact 25 for D5 / F1 pressure faults after a hard frost or heavy servicing schedule.

Isolate safely

Isolate, drop the case front. Undo the siphon quick-release clip on Main Eco Compact 25, tip out old fluid.

Fit and commission

Prime the new siphon with 250 mL clean water before refitting — dry siphons throw immediate flue-pressure faults.

Recommission checklist

Refill the Main Eco Compact 25 to 1.2 bar cold. Bleed high-point radiators and the internal AAV.

Run a full flue-gas analysis after 15 minutes. Log the reading against the OEM commissioning envelope in the Benchmark book.

Frequently asked questions

Interval?
Inspect annually at service; replace at 5-year mark or after any freeze event.
Can I fit generic?
No — use OEM only; the seal geometry on Main Eco Compact 25 varies between production years.
Do I need to notify the manufacturer?
Only if the Main Eco Compact 25 is in warranty — Main require log of any part swap for labour claims.
Shop the spares

Browse boiler spares14,820 live parts.

View Boiler Spares