How to Replace the Pressure Relief Valve on a Potterton Assure 30 (UK)
Step-by-step UK guide to replacing the 3-bar PRV on a Potterton Assure 30. Part numbers, torques, commissioning.
Potterton
The part
Fit a new 3-bar PRV on Potterton Assure 30 when water dribbles constantly from the outside discharge pipe.
Isolate safely
Drain below the PRV, unscrew the old valve and fit new PTFE tape (10 turns clockwise).
Fit and commission
On Potterton Assure 30 the PRV sits on the hydraulic block — torque to 25 Nm to avoid cracking the plastic manifold.
Recommission checklist
Refill the Potterton Assure 30 to 1.2 bar cold. Bleed high-point radiators and the internal AAV.
Run a full flue-gas analysis after 15 minutes. Log the reading against the OEM commissioning envelope in the Benchmark book.
Frequently asked questions
- Why does the new one still weep?
- Almost always the expansion vessel — check pre-charge first before condemning the PRV.
- Any WRAS approval?
- Only fit WRAS-approved 3-bar PRVs to keep Potterton Assure 30 within its Gas Safe commissioning envelope.
- Do I need to notify the manufacturer?
- Only if the Potterton Assure 30 is in warranty — Potterton require log of any part swap for labour claims.
Shop the spares
Browse boiler spares — 14,820 live parts.
View Boiler Spares