UK trade guideBoiler Spares 5 min readUpdated 11 July 2026

How to Replace the Ignition Electrode on a Vokera Vision 25C (UK)

Step-by-step UK guide to replacing the spark / ionisation electrode on a Vokera Vision 25C. Part numbers, torques, commissioning.

Vokera

The part

Renew the ignition and flame-sense electrodes on Vokera Vision 25C when you get F27 / EA / L2 flame-detection faults after a clean burn.

Isolate safely

Both electrodes on Vokera Vision 25C use ceramic insulators — never re-use if chipped.

Fit and commission

Set the spark gap to 3.5–4.0 mm and the ionisation gap so the tip sits 4–5 mm above the burner surface.

Recommission checklist

Refill the Vokera Vision 25C to 1.2 bar cold. Bleed high-point radiators and the internal AAV.

Run a full flue-gas analysis after 15 minutes. Log the reading against the OEM commissioning envelope in the Benchmark book.

Frequently asked questions

Combined or separate?
Vokera Vision 25C runs a two-electrode kit — one spark, one sense. Fit both together to avoid a second call-back.
How do I test ionisation current?
In service mode read the µA value on Vokera Vision 25C. Below 4 µA at steady state means clean or replace.
Do I need to notify the manufacturer?
Only if the Vokera Vision 25C is in warranty — Vokera require log of any part swap for labour claims.
Shop the spares

Browse boiler spares14,820 live parts.

View Boiler Spares